|
Fee Schedule
(adopted by GSCPC 3/13/08, effective 4/1/08)
Back to
Planning and Zoning
Printer
Friendly View

|
Comprehensive Plan Amendment |
|
|
|
·
Application Review / Comprehensive Plan Revision (Text / Map) |
|
$1,040 |
|
·
Traffic Study Review |
|
$390 |
|
|
|
|
|
Rezoning |
|
|
|
·
Zone Change |
|
$750 |
|
·
PUD Zone Change |
|
$975 |
|
·
Concept Plan
(Required for Zone Change and may be required for Preliminary
Subdivision) |
|
$525 + 15/ac |
|
|
|
|
|
Development Plans |
|
|
|
Office, Commercial or Industrial |
|
|
|
·
Preliminary Plan |
|
$775 + $22/ac |
|
·
Final Plan |
|
$465 + $16/ac |
|
Residential
(Single Family, Duplex, Attached, Multiple Family) |
|
|
|
·
Preliminary Plan |
|
$775 + $8/Unit |
|
·
Final Plan |
|
$465 + $5/Unit |
|
|
|
|
|
Subdivisions |
|
|
|
·
Preliminary Plat |
|
$525 + $18/lot |
|
·
Final Plat |
|
$325 + $15/lot |
|
·
Minor Plat |
|
$125 (includes recording fee) |
|
·
Consolidation Plat |
|
$125 (includes recording fee) |
|
|
|
|
|
Amendments |
|
|
|
·
Minor Amendments to Plats and Plans |
|
$385 |
|
·
Major Amendments to Plats and Plans |
|
Major amendments shall
follow the same process as for preliminary plats or plans |
|
|
|
|
|
Conditional Use Permit and Other Approvals – Board of Adjustment |
|
·
Conditional Use Permit |
|
$100 |
|
·
Home Occupation – Conditional Use Permit |
|
$75 |
|
·
Variance |
|
$75 |
|
·
Administrative Review |
|
$75 |
|
|
|
|
|
Special Studies |
|
|
|
·
Traffic Study Review |
|
$390 |
|
|
|
|
|
Grading and Construction Plans |
|
|
|
·
Engineering Review and Inspection
(See note # 7)
|
|
One Half Percent (0.5%)
of Estimated Construction Cost ($500 minimum) |
|
·
Grading/BMP Plan Only Review and Inspection |
|
$500 |
|
·
Revision to Construction Plans |
|
One-half (50%) of the Original Fee |
|
|
|
|
|
Cellular / Microwave Telecommunications Tower |
|
|
|
·
Cellular / Microwave Telecommunications Towers (also includes Building
& Electrical Permit) |
|
$2,500 |
|
·
Co-location of Cellular Telecommunications Device or Tower |
|
$250 |
|
|
|
|
|
Documents / Maps |
|
|
|
·
Zoning Ordinance |
|
$20 |
|
·
Subdivision & Development Regulations |
|
$20 |
|
·
Comprehensive Plan |
|
$35 per volume |
|
·
Land Use Map |
|
No Charge |
|
·
Misc. Copying |
|
$0.10 per page (8.5 x
11); others as posted |
|
·
Duplication of meeting tapes |
|
$15 per tape |
|
|
|
|
|
Other |
|
|
|
·
Appeals to the Executive Committee
(Requested by Applicant, not staff) |
|
$75 |
|
·
Special (Called) Meeting
(Requested by Applicant, not staff) |
|
2x
filing fee + $300 + publication costs |
|
|
|
|
1.
All zone change
applications require a concept plan.
2.
Cost for
advertising public hearings (i.e., zone change, special (called) meetings) is
the responsibility of the applicant.
3.
Major amendments
will be classified as either preliminary or final plats; or preliminary or final
plans.
4.
There is a 1.0
acre minimum charge for all applicants; applications that contain a portion or
fraction of an acre will be rounded up or down (0.5 = rounded down; 51-99 =
rounded up) to the nearest whole acre.
5.
Plans involving
cluster residential developments will be charged based on the actual cluster
area and any additional area to be disturbed (i.e., drainage facilities, road
construction), not the preserved acreage.
6.
All in-house
reviews (i.e., minor plats, construction plans, final plats/plans), excluding
those to be reviewed by the full Planning Commission, require a 20 working day
review period.
7.
Estimated
Construction Cost to be calculated by design engineer per plan quantities of
specified infrastructure items with cost based on current KYTC average unit
prices. Fee must be received prior to issuance of a grading permit.
|